One Nation, Under God

MDT proposes project for U.S. Highway 2

The Montana Department of Transportation (MDT) would like to notify the public and seek comments on a proposal to micro-surface about 8.1 miles of U.S. Highway 2 between Dodson and Malta in Phillips County. The project begins east of Dodson at reference post 458.6 (east of the railroad overpass) and extends east for 8.1 miles ending west of Malta at reference post 466.72.

Proposed work includes micro-surfacing to fill ruts, seal and cover, centerline and shoulder rumble strips, delineation, and pavement markings. The purpose of the project is to extend the life and service of the existing pavement.

The project is tentatively scheduled for construction in 2018, depending on completion of all project development activities and availability of funding. No new right-of-way or utility relocations will be needed.

For more information, please contact Glendive District Administrator Shane Mintz at (406) 345-8212 or Project Design Engineer Kevin Gilbert at (406) 444 6230. Members of the public may submit written comments to the Montana Department of Transportation Glendive office at P.O. Box 890, Glendive, MT 59330-0890, or online at:

http://www.mdt.mt.gov/mdt/comment_form.shtml

Please note that your comments are for project UPN 9000. Alternative accessible formats of this information will be provided upon request by contacting the Office of Civil Rights, P.O. Box 201001, Helena, MT 59620; (406) 444-9229; fax (406) 444-7243, or e-mail to [email protected]. Those using a TTY may call (800) 335-7592 or through the Montana Relay Service at 711.

 

Reader Comments(0)

 
 
Rendered 11/14/2024 11:17